By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
The Nile Wires
Ad imageAd image
  • News
    • Regional
    • International
    • National
  • Politics
  • Business
  • Opinion
  • Defence & Security
  • Tourism
  • Technology
  • Sports
  • +MORE
    • Education
    • Lifestyle
    • Health
    • Crime
Reading: NWSC Managing Director Inspects Kagera Water Project, Urges Quality, Collaboration
Search
The Nile WiresThe Nile Wires
Font ResizerAa
Search
  • News
    • Regional
    • International
    • National
  • Politics
  • Business
  • Opinion
  • Defence & Security
  • Tourism
  • Technology
  • Sports
  • +MORE
    • Education
    • Lifestyle
    • Health
    • Crime
Have an existing account? Sign In
Follow US
© The Nile Wires. All Rights Reserved.
The Nile Wires > News > National > NWSC Managing Director Inspects Kagera Water Project, Urges Quality, Collaboration
BusinessNationalNews

NWSC Managing Director Inspects Kagera Water Project, Urges Quality, Collaboration

Ronald KasomaNile Wires
Last updated: March 17, 2025 10:05 am
By
Ronald Kasoma
Nile Wires
2 Min Read
Share
National Water and Sewerage Corporation (NWSC) Managing Director Dr. Eng. Silver Mugisha inspecting the Kagera Water Project.
SHARE

The Kagera Water Project is nearing completion, with National Water and Sewerage Corporation (NWSC) Managing Director Dr. Eng. Silver Mugisha emphasizing the need for patriotism and collaboration to ensure timely completion by June.

During a preliminary inspection in Kikagate, Isingiro District, Dr. Mugisha highlighted challenges faced by the project, including difficulties in obtaining permission to lay pipelines through Katete Road and delays in installing a 1km section in Isingiro.

“We have faced some challenges, particularly with getting clearance for the pipeline through Katete Road and some delays in Isingiro,” Dr. Mugisha said. “However, we are determined to complete this project, which will significantly improve water supply and living standards.”

The 68-million-euro project, funded by the Agence Française de Développement (AFD), features a drinking water treatment plant, irrigation water production capacity, dual water intake, and 60km of pipelines. Electrical and mechanical works, as well as pump testing, have been completed, and the treatment plant is 85% finished.

Dr. Mugisha urged the project team to be proactive in addressing challenges and emphasized the need for quality and stakeholder engagement. “Continuous stakeholder engagement is vital for smooth execution,” he said. “Be proactive in solving challenges through effective communication and collaboration.”

NWSC Senior Director of Projects and Capital Development, Eng. Paddy Twesigye, noted the project’s benefits for rural and urban communities. “We are nearing completion, with ongoing testing of equipment and verification of minimum water flows,” Twesigye said.

The project is expected to improve water supply in Mbarara City, Isingiro, and surrounding areas, with completion anticipated by June 2025.

TAGGED:Ministry of WaterNational Water & Sewerage CorporationNWSCsilver mugisha
Share This Article
Facebook Whatsapp Whatsapp
Leave a Comment

Leave a Reply

You must be logged in to post a comment.

You Might Also Like

Defence & SecurityFeaturedNationalNewsPoliticsRegional

Museveni Urges Dialogue as Key to Ending Sudan Conflict

By
Ronald Kasoma
3 Min Read
BusinessFeaturedNewsRegional

Empower Women Through Finance: H.E. Kagame Tells Financial Alliance for Women Summit.

By
Ronald Kasoma
4 Min Read
BusinessOpinionSpecial Report

Pride Bank Limited The New Kid On The Block Ushers in a New Banking Era in Uganda

By
Ronald Kasoma
3 Min Read
The Nile Wires
Our dedicated team of journalists brings you accurate and reliable news coverage, keeping you updated on the stories that matter.

Categories

  • News
    • Regional
    • International
    • National
  • Politics
  • Business
  • Opinion
  • Defence & Security
  • Tourism
  • Technology
  • Sports
  • +MORE
    • Education
    • Lifestyle
    • Health
    • Crime

Quick Links

  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

Copyright 2025. Nile Wires. All Rights Reserved.

Copyright 2025. Nile Wires. All Rights Reserved
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?